Projects > Municipal Pipeline > Pajaro Valley Waterline


  • Fast Facts
  • Description
  • Photo Gallery
  • Articles and News

Project Details

 Project Type:    Open Trench and HDD Project 
  Location:    Watsonville, CA.  
Owner:    Pajaro Valley Water Management Agency (PVWMA)  
Engineer:    CH2M Hill Engineers 
Contract Value:   $17,791,160 
Contract Type:    Public Development 
     Completion Date:  June 30, 2008 

Project Highlights:

  • Installation of approximately 52,00 LF of Welded Steel Pipe(WSP)
  • Pipeline diameters ranged from 6” to 36”
  • Numerous appurtenances (blow-off’s, air valves, isolation valves, irrigation turnouts and cathodic    protection)
  • Two 54” steel casing tunnel crossings under State Coast Highway 1
  • 36” heavy-wall WSP (HDD) crossing under the Pajaro River 1,300 LF in length
  • Flow-meter assemblies that include electrical instrumentation and control features
  • Significant pavement replacement, traffic control and trench de watering systems
  • Construction transgressed through hundreds of active table crop acres growing strawberries,    brussel sprouts, artichokes and similar varieties of food products


Downloads:


Coastal Distribution Survey Results Map


Back to Municipal Pipeline Projects Page

Articles & News

Coastal Distribution Survey Results Map

CDS project construction of the two phases can be see on the following survey map.
Download pdf (95KB) here

Back to Municipal Pipeline Projects Page





555 Exchange Court, Livermore California 94550 | Headquarters Phone: 925-373-8370
Serving the entire western US including Hawaii.
© Copyright 2009 Mountain Cascade Corporation
-->