
Projects by Type
- Municipal Pipeline Projects
- Private Development Projects
- Concrete Structures
- Pumping Facilities
- Reservoirs & Water Tanks
- Trenchless Projects
- Other Projects
Projects > Trenchless > Pajaro Valley Waterline
- Fast Facts
- Description
- Photo Gallery
- Articles and News
Project Details
| Project Type: | Open Trench and HDD Project |
| Location: | Watsonville, CA. |
| Owner: | Pajaro Valley Water Management Agency (PVWMA) |
| Engineer: | CH2M Hill Engineers |
| Contract Value: | $17,791,160 |
| Contract Type: | Public Development |
| Completion Date: | June 30, 2008 |
Project Highlights:
- Installation of approximately 52,00 LF of Welded Steel Pipe(WSP)
- Pipeline diameters ranged from 6” to 36”
- Numerous appurtenances (blow-off’s, air valves, isolation valves,
irrigation turnouts and cathodic protection) - Two 54” steel casing tunnel crossings under State Coast Highway 1
- 36” heavy-wall WSP (HDD) crossing under the Pajaro River 1,300 LF in length
- Flow-meter assemblies that include electrical instrumentation and control features
- Significant pavement replacement, traffic control and trench de watering systems
- Construction transgressed through hundreds of active table crop acres growing strawberries,
brussel sprouts, artichokes and similar varieties of food products
Downloads:
Coastal Distribution Survey Results MapBack to Trenchless Projects Page
Articles & News
Coastal Distribution Survey Results Map
CDS project construction of the two phases can be see on the following survey map.Download pdf (95KB) here
Back to Trenchless Projects Page
