Projects > Municipal Pipeline > Oakland Gravity Sewer Interceptor
- Fast Facts
- Description
- Photo Gallery
- Articles & News
Project Details
| Project Type: | Open Cut Pipeline |
| Location: | Oakland, California |
| Owner: | East Bay Municipal Utility District |
| Engineer: | DODSON – PSOMAS |
| Contract Value: | $4,049,049.00 |
| Contract Type: | Public Works |
| Completion Date: | April 9, 2009 |
Project Highlights:
- Abandon existing 63-inch reinforced concrete sewer filled with CLSM (approximately 1,100 LF)
- Install open cut new 66-inch Reinforced Concrete Pipe (RCP) (Approximately 1,100 LF)
- Build two new Reinforced Concrete Connection Manhole Structures
- Build three new Reinforced Concrete Manholes
- Perform Sewer Main Bypassing to divert sewage to allow tie in of the new gravity sewer line to existing interceptor
- Install new level monitoring station at Oakport Diversion Structure.
- Construct site improvements at Pump Station H
Downloads:
EBMUD Oakland Interceptor Reference Letter (640k)Back to Municipal Pipeline Projects Page
Articles & News
EBMUD Oakland Interceptor Reference Letter
The quality of work was very high and the project was completed on schedule, was adequately staffed and Mountain Cascade, Inc. worked expeditiously to finish the project. Download a complete copy of this Letter(640k)Back to Municipal Pipeline Projects Projects Page