Projects > Municipal Pipeline > Oakland Gravity Sewer Interceptor


  • Fast Facts
  • Description
  • Photo Gallery
  • Articles & News

Project Details

  Project Type:    Open Cut Pipeline 
  Location:    Oakland, California 
Owner:    East Bay Municipal Utility District     
Engineer:    DODSON – PSOMAS  
Contract Value:    $4,049,049.00 
Contract Type:    Public Works 
     Completion Date:   April 9, 2009 

Project Highlights:

  • Abandon existing 63-inch reinforced concrete sewer filled with CLSM (approximately 1,100 LF)
  • Install open cut new 66-inch Reinforced Concrete Pipe (RCP) (Approximately 1,100 LF)
  • Build two new Reinforced Concrete Connection Manhole Structures
  • Build three new Reinforced Concrete Manholes
  • Perform Sewer Main Bypassing to divert sewage to allow tie in of the new gravity sewer line to    existing interceptor
  • Install new level monitoring station at Oakport Diversion Structure.
  • Construct site improvements at Pump Station H

Downloads:

EBMUD Oakland Interceptor Reference Letter (640k)

Back to Municipal Pipeline Projects Page

Articles & News

EBMUD Oakland Interceptor Reference Letter

The quality of work was very high and the project was completed on schedule, was adequately staffed and Mountain Cascade, Inc. worked expeditiously to finish the project. Download a complete copy of this Letter(640k)

Back to Municipal Pipeline Projects Projects Page


555 Exchange Court, Livermore California 94550 | Headquarters Phone: 925-373-8370
Serving the entire western US including Hawaii.
© Copyright 2009 Mountain Cascade Corporation
-->