
Projects by Type
- Municipal Pipeline Projects
- Private Development Projects
- Concrete Structures
- Pumping Facilities
- Reservoirs & Water Tanks
- Trenchless Projects
- Other Projects
Projects > Trenchless > A Line Relief Interceptor Phase 2A
- Fast Facts
- Description
- Photo Gallery
- Articles & News
Project Details
| Project Type: | Trenchless Project |
| Location: | Concord, California |
| Owner: | Central Contra Costa Sanitary District |
| Engineer: | Carollo Engineers |
| Contract Value: | $20,650,750 |
| Contract Type: | Public Works |
| Completion Date: | In Progress |
Project Highlights:
- Four Tunnel Shafts using interlocking sheet pile methods
- Unique Octagon Shaped Configuration of the shafts
- Substantial Ground Dewatering
- 540 LF of twin 48” diameter RCP Sewer installed open cut
- Concrete encasement of the open cut pipeline
- 838 LF of 72” diameter RCP installed by MTBN
- 3,009 LF of 96” diameter RCP installed by EPBM
- 36” Venturi Sewer Flow Metering Structure (40’ Deep)
Downloads:
- Trenchless News-- Summer 2008 (445KB PDF)
- A-Line Relief CCCSD News Fall 2008 (6.4MB PDF)
- A-Line Relief CCCSD News Summer 2008 (19.2MB PDF)
- A-Line Relief Sewer Investing (8MB PDF)
Back to Trenchless Projects Page
Articles & News
Trenchless News-- Summer 2008
The City of Concord, CA in unison with Central Contra Costa Sanitary District (CCCSD) is in the process of getting an essential sewer line replacement which will decommission one of the largest pumping stations in the country.Download a copy of this article (445KB PDF)
A-Line Relief CCCSD News Fall 2008
Infrastructure Improvements by the City and CCCSD.Download a copy of this article (6.4MB PDF)
A-Line Relief CCCSD News Summer 2008
CCCSD sewer system has been updated to one of the best in California.Download a copy of this article (19.2MB PDF)
A-Line Relief Sewer Investing
Sewer Construction increased capacity and reduced potential for wet weather overflow.Download a copy of this article (8MB PDF)
Back to Trenchless Projects Page

